Drumming
rain on canvas
Vibrates inside my brain;
I want to sleep but can’t
Camping once again.
Vibrates inside my brain;
I want to sleep but can’t
Camping once again.
Ground
unyielding beneath
Rain relentless above;
So glad it’s only one night
Camping is not my love.
Rain relentless above;
So glad it’s only one night
Camping is not my love.
Dawn
arrives with haste
I feel unready and unwilling
A day of entertaining cub scouts
While the puddles are a-filling.
I feel unready and unwilling
A day of entertaining cub scouts
While the puddles are a-filling.
The
boys are making a racket
Be surprised if we’re allowed back
Parrots are screeching loudly
Sounds like we’re under attack.
Be surprised if we’re allowed back
Parrots are screeching loudly
Sounds like we’re under attack.
A
deep booming ‘crack’ overhead
Cuts through the din all around
An ominous creaking begins
Never felt so much fear from a sound.
Cuts through the din all around
An ominous creaking begins
Never felt so much fear from a sound.
As
I scramble to escape
The bough fall is relentless
My mind runs wild in fear
Action invisible through canvas.
The bough fall is relentless
My mind runs wild in fear
Action invisible through canvas.
The
impact has a resonance
I feel vibrating like thunder
A terrifying silence follows
Except where my heart shudders.
How I wish for the chatter
Of those ten excited children
And those raucous birds at dawn
Life without, a vision truly barren.
I feel vibrating like thunder
A terrifying silence follows
Except where my heart shudders.
How I wish for the chatter
Of those ten excited children
And those raucous birds at dawn
Life without, a vision truly barren.
Finally
reaching the light
Gratitude floods over
The children emerge and run about
Fall couldn’t have been much closer.
Gratitude floods over
The children emerge and run about
Fall couldn’t have been much closer.
No longer caring what others think
How thoughts change in a second
When precious life is threatened.
Lady Satellite
No comments:
Post a Comment