Contradictions
too vast to contemplate,
here, but not
gone, but here
an end with a beginning, yet ended with permanency
everything the same and yet all changed
life continues, yet simultaneously stops.
here, but not
gone, but here
an end with a beginning, yet ended with permanency
everything the same and yet all changed
life continues, yet simultaneously stops.
What
life?
Why
is the world turning even now
and grass standing tall where manicured lawn should be?
and grass standing tall where manicured lawn should be?
How
can life go on, when life has stopped?
Insignificant!
We are as pollen grains stuck to the hind legs of a bee
carried by vast forces beyond our understanding
vital parts of ecosystem Gaia
individually insignificant
yet potent as a mass.
We are as pollen grains stuck to the hind legs of a bee
carried by vast forces beyond our understanding
vital parts of ecosystem Gaia
individually insignificant
yet potent as a mass.
You
are gone and nothing has changed
it is as if, you never were.
it is as if, you never were.
These
cherished objects, carried lovingly south
will mean nothing when I too depart.
will mean nothing when I too depart.
Our
tenure here exposed as a hologram
a play from which you exited stage left.
a play from which you exited stage left.
We
do not have life
just mechanical functions within a complex machine
demonstrating potentials
power switched on/off at will
gene pool Earth
an experiment in genetics and human nature.
just mechanical functions within a complex machine
demonstrating potentials
power switched on/off at will
gene pool Earth
an experiment in genetics and human nature.
I
wonder how we compare to Kepler-452b?
Are
we performing well?
What
did my Mother’s life
contribute to the collective knowledge?
contribute to the collective knowledge?
Me,
I suppose.
Will
she be recycled, upcycled, reused?
Am
I the upcycling?
How
will the experiment end?
I am here, but not
life unreal without you.
Lady Satellite
No comments:
Post a Comment