Showing posts with label consciousness. Show all posts
Showing posts with label consciousness. Show all posts

Sunday, 22 February 2015

119: Life Without Limits


I breathe and you come closer
With every inward breath your thoughts turn in my direction
With every exhalation I connect to you
There is a natural rhythm here that won’t be denied.


Neither time nor space exist
The energy between us is a living being
We slip into that other reality, that parallel universe
Where fear and negativity are unknown.


We have no need to limit our experience
Love surrounds and nurtures
Permeating every thought.


This super-charged atmosphere is rich in opportunity
Our hearts expand to their full potential
As we discard our physical form

Love is all there is.

Lady Satellite


Tuesday, 18 November 2014

25: Energy


Everything is energy that is all we are;
a magnetic field of vibrating consciousness.
As an idea, it’s quite bizarre!

Here I sit comfortably, relaxing in my chair.
I can see myself, I know I’m here;
but of more I am aware.

I am listening to music, reminiscent of the sea.
The melody flows, like shimmering waves
and the strings vibrate, along with me.

I feel this music resonate, in each and every cell.
I am vibrating, I can feel it.
My heart knows this feeling well.

For this is life, this oscillation;
just a pulse at quantum level.
Feeling is all there is. I am pure vibration.

Lady Satellite