Showing posts with label energy. Show all posts
Showing posts with label energy. Show all posts

Tuesday, 14 July 2015

219: Loss

Vigorous yet fragile we are naught but energy.
No longer bound to this place, freedom restored you took your leave.
Now fly, run, dance, do all the things you could never do.
We who are left behind, though grieving, happy for you.

Lady Satellite

Saturday, 28 February 2015

125: Waiting

He was waiting at the station
Glad to be lost in the throng of evening commuters
This time every day was precious to him
Nothing to do, nobody to interrupt his thought.
Eyes closed stood leaning back against the wall
Rhythmic breathing calmed him and allowed him to connect
Breathing in three times calling her name in his head
Felt pressure building in his chest
Heart filling with the sense of her.
Lungs full he released the energy back with his outward breath and waited
As next breath came he was jolted by a shock of energy
She was here, she was with him.
Though they were far apart he communed this way every day
Meditation was what got him through this self-imposed pain of separation
One day he would get on the train and go back to her
One day
But not today
He wasn’t ready.

Lady Satellite

This was written in response to a sentence starter 'He/She was waiting at the station' given at a Writing for Performance workshop.

Tuesday, 18 November 2014

25: Energy


Everything is energy that is all we are;
a magnetic field of vibrating consciousness.
As an idea, it’s quite bizarre!

Here I sit comfortably, relaxing in my chair.
I can see myself, I know I’m here;
but of more I am aware.

I am listening to music, reminiscent of the sea.
The melody flows, like shimmering waves
and the strings vibrate, along with me.

I feel this music resonate, in each and every cell.
I am vibrating, I can feel it.
My heart knows this feeling well.

For this is life, this oscillation;
just a pulse at quantum level.
Feeling is all there is. I am pure vibration.

Lady Satellite