Showing posts with label parallel universe. Show all posts
Showing posts with label parallel universe. Show all posts

Sunday, 22 February 2015

119: Life Without Limits


I breathe and you come closer
With every inward breath your thoughts turn in my direction
With every exhalation I connect to you
There is a natural rhythm here that won’t be denied.


Neither time nor space exist
The energy between us is a living being
We slip into that other reality, that parallel universe
Where fear and negativity are unknown.


We have no need to limit our experience
Love surrounds and nurtures
Permeating every thought.


This super-charged atmosphere is rich in opportunity
Our hearts expand to their full potential
As we discard our physical form

Love is all there is.

Lady Satellite