Showing posts with label nerves. Show all posts
Showing posts with label nerves. Show all posts

Wednesday, 14 January 2015

81: Calm Before The Storm


Waiting, waiting
Time for change
Face it, face it
Don’t delay
Dig deep, dig deep
Lead the way.

Move on, move on
The time is now.
Stay calm, stay calm
Let nothing show.
Walk tall, walk tall
And let it go.

Breathe, just breathe
And go with the flow.

It’s just a room
In a public building
This is no prison
Unless in your mind.
The people are all scared
Don’t take on their cares
Relax your body
Let your mind unwind.

The past is flown
The future is unknown
What more is there to say?
Love your life
Live your love
Enjoy being here today.

Yes, you can enjoy
What once was raw
Open your heart
And step through that door.

Lady Satellite

Thursday, 6 November 2014

13: Vulnerable


Love me, soothe me.
Take away my fears.
Move me, soothe me.
Kiss away my tears.

Hold me, soothe me.
Walk along the sand.
Hold me tight.
Steady my hand.
I am vulnerable tonight.

Guide me, soothe me.
Melt away my nerves.
Hold my gaze.
Greet my soul.
Let me see who you are at last.


Lady Satellite