Showing posts with label 13. Show all posts
Showing posts with label 13. Show all posts

Thursday, 6 November 2014

13: Vulnerable


Love me, soothe me.
Take away my fears.
Move me, soothe me.
Kiss away my tears.

Hold me, soothe me.
Walk along the sand.
Hold me tight.
Steady my hand.
I am vulnerable tonight.

Guide me, soothe me.
Melt away my nerves.
Hold my gaze.
Greet my soul.
Let me see who you are at last.


Lady Satellite