Showing posts with label letting go. Show all posts
Showing posts with label letting go. Show all posts

Wednesday, 26 November 2014

33: The Child


Feed me
love me
nourish me
forever.

Guide me
love me
treasure me
as I grow.

Hear me
love me
heal me
once again.

Watch me
give me space
love me
let me go.

Lady Satellite