Sometimes
life throws me lemons
and I wonder what to do;
but you can’t bring me down,
I’m always gonna win through.
and I wonder what to do;
but you can’t bring me down,
I’m always gonna win through.
Got
a letter from the government,
that says they overpaid
and now they want it back again.
I really was dismayed.
that says they overpaid
and now they want it back again.
I really was dismayed.
Sometimes
life throws me lemons
and I wonder what to do;
but you can’t bring me down,
I’m always gonna win through.
and I wonder what to do;
but you can’t bring me down,
I’m always gonna win through.
My
girl’s car got damaged,
by a driver that didn’t stop.
The bumper’s bent and mangled
and now she’s out of pocket.
by a driver that didn’t stop.
The bumper’s bent and mangled
and now she’s out of pocket.
These things
should make me angry,
but I don’t want that in my life.
I’m gonna smile and let it go.
I don’t need that kind of strife.
but I don’t want that in my life.
I’m gonna smile and let it go.
I don’t need that kind of strife.
I
sent out a call for coffee,
friends replied from across the globe.
Local Kerry came to the rescue.
You always give me hope.
friends replied from across the globe.
Local Kerry came to the rescue.
You always give me hope.
Sometimes
life throws me lemons
and I wonder what to do;
but you can’t bring me down,
with a friend I’m gonna win through.
and I wonder what to do;
but you can’t bring me down,
with a friend I’m gonna win through.
Lady Satellite
Not just a poem today but a song with a variable chorus.