Showing posts with label happiness. Show all posts
Showing posts with label happiness. Show all posts

Wednesday, 10 June 2015

208: Bottle This


One hand on the dashboard
banging out the beat
five fingers on the steering wheel
tapping down the street.

Lungs at full capacity
volume maxed out singing
high energy electronic dance music
has got my brainwaves zinging.

My body propelled by music
is bouncing on the spot
celebrating happiness
by giving all I’ve got.

You might think I’m crazy
partying on my own
but if you knew this feeling
there’d be no cause to moan.

Everything right in my world today
emotions I’d love to bottle
happiness spilling over
just like winning lotto.

If I could find a way to capture this
I’d take a draft each morning
the perfect winter antidote
to a cold start when I’m yawning.


Lady Satellite

Thursday, 12 February 2015

109: Happiness Is A Pair Of Shoes I Love


It’s fun
That’s why I do it
Because I can
Because I want to
Because it makes me feel good.
I don’t care that I’m a head taller than you
I don’t care that it’s impractical
I don’t care that walking down hill requires careful execution.
You’ll catch me if I fall
You don’t care that I’m this tall
You like what you see and choose to be with me.
It’s sexy
It’s sassy
It’s sensational to be this happy.
Bugger practicality, it’s fun
I’ve wanted to do this for so long
I love my strappy high heel wedges
They go with my Bali blue dress
The one I waited ages to find
To match the shoes
I thought so divine.
So now the world can see, me up here
And I don’t care what you think
Their purpose is clear
Fun
Fun
Fun
And nothing else.
Happiness is a pair of shoes I love
And someone to strut with
Hand in glove.


Lady Satellite

Sunday, 8 February 2015

99: Waterbom Park


I watch in disbelief
Questioning, is this the same child?
Happy and carefree
Rushing in every direction
Climbing, then sliding, then standing underneath
Delighted as the bucket tips
Torrents of water, falling on your head.

Your innocent playful behaviour
Delights me
I am in love again.
I love my life
I love this amazing place of contrasts
My heart is full
Mere happiness does not describe this emotion.

I spend an hour drinking in this feeling
Replenishing my soul
I watch and wait enraptured
Until you have had your fill
And ask to leave.

We move on to ever greater thrills and achievements
From being unable to climb the steps in terror
To going alone to the top of the tower
And patiently waiting for another go.
I am in a state of constant wonder
At what you have achieved.
My doubts and recriminations have vanished
We will come here again
It has been worth the pain.


Lady Satellite

Saturday, 8 November 2014

15: Happy to Be


I watched the surf roll in with you,
the blue sky all around.
We laughed and chatted all breakfast through,
oblivious to the soothing sound.

A perfect way to start the day,
breakfast with a stunning view.
Nature’s splendour all around,
the sun, the surf, me and you.

We exist for a while in this timeless place,
happy to be, needing nothing more.
I’ll hold the memory of your handsome face
in this moment, beside the shore.
Don’t think ahead in time and space,
in this moment I need nothing more.


Lady Satellite

Tomorrow never comes, so make sure you live now!