Showing posts with label dancing. Show all posts
Showing posts with label dancing. Show all posts

Wednesday, 10 June 2015

208: Bottle This


One hand on the dashboard
banging out the beat
five fingers on the steering wheel
tapping down the street.

Lungs at full capacity
volume maxed out singing
high energy electronic dance music
has got my brainwaves zinging.

My body propelled by music
is bouncing on the spot
celebrating happiness
by giving all I’ve got.

You might think I’m crazy
partying on my own
but if you knew this feeling
there’d be no cause to moan.

Everything right in my world today
emotions I’d love to bottle
happiness spilling over
just like winning lotto.

If I could find a way to capture this
I’d take a draft each morning
the perfect winter antidote
to a cold start when I’m yawning.


Lady Satellite