Showing posts with label clothing. Show all posts
Showing posts with label clothing. Show all posts

Sunday, 31 May 2015

198: Choose Your Knickers Wisely!


What knickers to wear
for a cycling extravaganza
is an important decision to make.
Too long in the saddle
with the wrong sort of apparel
will leave you lying prostrate;
with your legs open wide
and a fan set on high
and an ice pack ready just in case!

No you daren’t make a mistake
with the undies you take
when perching on that saddle so narrow;
one slip and you’re done for
no sex for a week or more,
so have a care and choose wisely
for goodness sake!

Lady Satellite

Sunday, 10 May 2015

188: What to Wear for a Swim?

So many different outfits
you can see at the swimming pool
from the ‘oh no thanks’ budgie smugglers
to the seriously cool.

So much costume variety
you can find at the beach
some with acres on display
some with it all tucked up out of reach.

My thoughts on this issue
have changed over the years
along with body confidence
fashion and skin cancer fears.

In my twenties I loved the sun
and a tan I would seek
so I wore a string bikini
in Hawaii for a week.

Yes the waterfall was superb
and the weather was divine
but the company left much to be desired
as his comments undermined.

So I put away the two-piece
and stayed out of the water
till I had kids to teach
and got in again with my daughter.

But my confidence was shot
so I hid for ten long years
wearing an all black Speedo
prevented further tears.

When I got rid of that man
well my confidence it came back
so I took myself off shopping
for a costume that wasn’t black.

I bought a halter neck style
in my favourite aqua blue
it was pretty, frilly and feminine
and I looked good in it too.

So I headed to the pool
to take an aqua-fit class
I was so proud of that costume
but that feeling didn’t last.

The problem was apparent
as I stepped into the water
that beautiful frill just floated
and didn’t stay where it ought ’a.

How’s a girl supposed to exercise
when tangled up in lycra?
I couldn’t figure it out
so I just bought something tighter.

Today at the leisure centre
it was back to black again
this one a tight-fitting sexy number
that to put on was a pain.

Well I wriggled and I jiggled
for a whole ten minutes
but eventually I managed
to get my body in it.

I walked out in the water
feeling confident and fab
no floaty bits to trap me
and no sign of any flab.

I started in the shallows
and headed for the deep
just a leisurely breast stroke
as I had no time to beat.

Around about half way
I was struggling quite a bit
breathing was a little difficult
obviously not that fit.

I valiantly swam on
until I completed my four lengths
then I near collapsed
totally devoid of strength.

I couldn’t understand
what had happened to my fitness
as my world began to spin
I felt sick and quite ridiculous.

Then it hit me with great force
something’s cutting the blood supply
it’s this costume that’s the cause
and without oxygen I’ll die.

So it’s back to the shops for me
this one just won’t do
of course I could try skinny dipping
but I don’t think that’s legal. Do you?


Lady Satellite

Sunday, 11 January 2015

79: A Woman's Refrain

What shall I wear?
What shall I wear?

Do I dress for me?
Do I dress for you?
If it’s what I want
Does is please you too?

What shall I wear?
What shall I wear?

I’m not on this planet
to entertain, but
If I like that you like it
Does that make me vain?

What shall I wear?
What shall I wear?

Oh Heaven knows!
The question remains.
I’ll say it again.
It’s the woman’s refrain.

What shall I wear?
What shall I wear?

Now why do I care?
That’s an interesting question.
Because my mood is declared
By my clothing expression.

What shall I wear?
What shall I wear?

Am I happy and bold
As I walk out the door?
Or feeling tired and old
Can’t be bothered with more?

What shall I wear?
What shall I wear?

That’s it! I’m done
Too much psycho-analysis!
Choosing my clothes
Has ended in paralysis!

What shall I wear?
What shall I wear?

Quick! Make a decision.
Is it comfort or style?
Well I’m driving today
So that’s comfort by a mile.

What shall I wear?
What shall I wear?

Grab that old cotton dress
My most comfortable shoes
Pull my hair off my face
Style you lose!


Lady Satellite