Showing posts with label relief. Show all posts
Showing posts with label relief. Show all posts

Sunday, 7 June 2015

205: Relief


Inner space
safety’s place
no hard edges or demands
A treat to be
relaxed and free
the inner life brings grace.

Outer space
my life a race
cuts and bruises scar
always a chore
still hundreds more
step off the track, change pace.



Lady Satellite